| Process sheets | |||||||||||
| process | Craft Projects | manager | |||||||||
| pro-assemble | assemble | Job content | machine & tools | material | Operating instructions | time(S) | people | method | method2 | name | remark |
| fix the motor on frame | screw | according speaker. Some no need. | |||||||||
| make the cone hole (lead wire hole) | |||||||||||
| fix the lead wire on cone and glue. | if need fix lead wire on spider , Then do that. | ||||||||||
| fix terminal | machine or hand | ||||||||||
| put the voice coil on guage. Make correct height | |||||||||||
| put on board. | |||||||||||
| assemble II | |||||||||||
| process | Craft Projects | manager | |||||||||
| pro-assemble | assemble | Job content | machine & tools | material | Operating instructions | time(S) | people | method | method2 | name | remark |
| 部装 | 总装 | 作业内容 | 设备工具 | 辅助材料 | 工艺说明书 | 工时 | 人数 | 方式 | 方法 | 责任人 | 备注 |
| spider glued | glue on the frame spider seat | 1 point glue machine | spider glue | 3 | 1 | machine | machine, check the glue q'ty and uniform | ||||
| put spider | spider | 3 | 1 | hand | need turn 90degree and press | ||||||
| press the voice guage | put the voice coil into T-yoke | guage | voice coil | 6 | 2 | hand | the wire same angle with frame terminal | ||||
| neck glue and edge glue | put the glue at | 2 point glue machine | glue | 3 | 1 | machine | notice the neck glue, Aand B same q'ty, uniform. | ||||
| put cone | put cone at frame | cone | 6 | 2 | the lead wire same degree as terminal. Press the edge let glue run out a little. Check the neck up to cone center hole. | ||||||
| put gasket glue. | glue on the cone edge | glue machine | glue | 3 | 1 | uniform | |||||
| put gasket | assemble gasket on speaker | gasket | 6 | 2 | make the assemble hole correct to frame hole. And press a little | ||||||
| put on board. | wooden board. | check the gasket , cone surface. The vocie coil bobbin height. | |||||||||
| wait for glue dry | |||||||||||
| solding process. | |||||||||||
| process | Craft Projects | manager | |||||||||
| pro-assemble | assemble | Job content | machine & tools | material | Operating instructions | time(S) | people | method | method2 | name | remark |
| take out guage | check the glue dry? Flow down side? Another no good outlooking | ||||||||||
| fix the vocie coil wire to lead wire, | If lead wire fix on spider, Then need do this step and II process. | ||||||||||
| soldering | |||||||||||
| through lead wire into terminal lug hole. | |||||||||||
| soldering it | |||||||||||
| cut the remaining wire | |||||||||||
| magnetize | |||||||||||
| 1st time QC. | |||||||||||
| glue dust cap place | Use machine to fix. | ||||||||||
| attach dust cap | need put a small material let dust cap fix well | ||||||||||
| put on board wait dry | |||||||||||
| process | Craft Projects | manager | |||||||||
| pro-assemble | assemble | Job content | machine & tools | material | Operating instructions | time(S) | people | method | method2 | name | remark |
| 2nd QC | |||||||||||
| package or assemble with box. | |||||||||||




